Progress - Last 5 years

YEAR WISE PROGRESS ACHIEVED FOR CONSTRUCTION OF FIELD CHANNELS
DURING LAST FIVE YEARS (YEAR 2013-14 TO 2017-18)
  Sr. No. During the Year Length Lined in Kms. Area Covered in Hectare  
             
  1. 2013 - 2014 1239.22 67134  
             
  2. 2014 - 2015 970.90 6800  
             
  3. 2015 - 2016 3363.03 138398  
             
  4. 2016 - 2017 4757.79 210375  
             
  5. 2017 - 2017 156.29 4883  
             
    TOTAL 10487.23 488790  
             
 
Sr. No. Name of Project 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 2017 2017 - 2018 TOTAL
Length (Kms.) Area (Ha.) Length (Kms.) Area (Ha.) Length (Kms.) Area (Ha.) Length (Kms.) Area (Ha.) Length (Kms.) Area (Ha.) Length (Kms.) Area (Ha.)
                           
A) CADWM PROJECTS
1. Sirhind FeederPart-II 330.67 16414 237.12 22416 403.17 16232 462.65 19565 7.26 315 1440.87 74942
2. Bathinda Branch Part-II 121.73 5254 106.07 8340 113.30 5950 159.47 6611 0.67 34 501.24 26189
3. U.B.D.C. 18.75 1188 3.62 418 4.06 342 152.20 7795 14.83 744 193.46 10487
4. Kotla Branch -- -- -- -- 2050.00 61127 1670.20 62554 11.60 325 3731.80 124006
5. Ghaggar Branch -- -- -- -- -- -- 469.15 23924 12.86 661 482.01 24585
6. KandiCanal Stage-1 -- -- -- -- -- -- -- -- 104.00 2600 104.00 2600
TOTAL of A) 471.15 22856 346.81 31174 2570.53 83651 2913.67 120449 151.22 4679 6453.38 262809
                           
B) NABARD AIDED PROJECTS
1. Abohar Branch (District Faridkot) 383.94 26854 216.02 15109 249.39 17443 41.95 2934 -- -- 891.30 62340
2. Abohar Branch (Other Districts) 134.82 9430 164.32 15109 233.11 16304 121.69 8511 -- -- 653.94 45738
TOTAL 518.76 36284 380.34 26602 482.50 33747 163.64 11445 -- -- 1545.24 108078
1. B.M.B. 240.40 7525 170.71 5343 130.59 4087 210.39 6584 -- -- 752.09 23539
2. Sirhind Feeder Part-II (Above CADWM Norms) -- -- 37.25 2225 11.75 702 4.82 287 -- -- 53.82 3214
3. Bathinda Branch Part-II (Above CADWM Norms) -- -- 35.79 2656 36.71 2724 -- -- -- -- 72.50 5380
4. Repair and Reconst. of field channels of various Distys. In the State (RIDF-XXI) -- -- -- -- 130.95 13487 295.12 25659 -- -- 426.07 39146
5. Rejuvenation/Upgradation of main branches of S.F. and Btd.Br. District Shri Muktsar Sahib-RIDF-XXII). -- -- -- -- -- -- 848.86 35370 2.55 140 851.41 35510
TOTAL of B) 759.16 43809 624.09 36826 792.50 54747 1522.83 79345 2.55 140 3701.13 214867
   
C) UNDER STATE PLAN
1. Residual works of EasternCanal Part-I 8.91 469 -- -- -- -- -- -- -- -- 8.91 469
2. Construction of field channels of Sirhind Feeder under (PIDB). -- -- -- -- -- -- -- -- -- -- -- --
3. Lining/Relining of W/Cs of Sirhind Feeder Command under waterlogged area in district Sri Muktsar Sahib and Fazilka. -- -- -- -- -- -- 321.29 10581 2.52 64 323.81 10645
TOTAL of C) 8.91 469 -- -- -- -- 321.29 10581 2.52 64 332.72 11114
                           
Grand TOTAL
A+B+C=
1239.22 67134 970.90 68000 3363.03 138398 4757.79 210375 156.29 4883 10487.23 488790